Evaluation of the waste incineration plant Schongau-Altenstadt Independent Expert (Chief Engineer) Consultancy Services for technical and legal aspects regarding approval procedure
Crtical Examination
Planning services for Adaption of the RABA Rostock Compendium over the technical requirements and recommodation for the disposal of meat and bone meal and tallow in incineration plants Environmental Engineering Consultancy Services
Filtering of Flue gases
solutions on environmental problems
link zu startseite
link zu leistungen
link zu referenzen
link zu publikationen
link zu kontakt
platzhalter
platzhalter
hanse_logo
Power Engineering
 
Recovery of waste
Home
Sitemap
Mail
Legal notice
platzhalter
dr_logo

2003/2005 Commission on Air Pollution Prevetion of VDI and DIN - Standards Committee(KRdL) In charge for working out a new guideline VDI 3460 Blatt 2
"Emission Control - Energy conversion at thermal treatment of waste"
2003 IAG-Ihlenberger Abfallentsorgungsgesellschaft mbH, Selmsdorf Planning services for the technical adaptation of the RABA Rostock
(as a subcontract from wandschneider + gutjahr and in cooperation with the lawyer Dr. Bodo A. Baars)
2003 Verbund der Betreiber der Hausmüllverbrennungsanlagen in Norddeutschland
(Nordverbund)
Expert opinion on the impact of the most recent rulings of the European Court of Justice (judgements C-228/00 und C-458/00 of 13.02.2003) on the incineration of waste in domestic waste incineration plants.
(in cooperation with the lawyer Dr. Bodo A. Baars)
2003 MVA Stapelfeld GmbH Comment on the transport of waste, AS code no. 19 12 10, from the Netherlands to the waste incineration plant MVA for utilization
(in cooperation with the lawyer Dr. Bodo A. Baars)
2002/2003 Arbeitsgemeinschaft der Sonderabfall-Entsorgungsgesellschaften der Länder (AGS)
and the
Bundesverbandes der Sonderabfallverbrennungsanlagen (BDSVA)
Expert report on the repercussions of the rulings of 13.02.2003 reached by the European Court of Justice in cases C-228/00 (EU Commission versus FRG) and C-458/00 (EU Commission versus Luxembourg) on the line of the final motions by the Advocate General Jacobs of 26.09.2002.
(in cooperation with the lawyer Dr. Bodo A. Baars)
2002/2003 Fachagentur Nachwachsende Rohstoffe (FNR), Gülzow, (project funded by the Federal Ministry of Consumer Protection, Food and Agriculture - BMVEL) Evaluation of the waste incineration plant Schongau-Altenstadt (as a subcontract from wandschneider + gutjahr and in cooperation with the lawyer Dr. Bodo A. Baars)
2001/2002 The Land Baden- Württemberg represented by the Regional Commission of Freiburg Technische und Rechtliche Bewertung der Anlage zum Recycling von Aluminiumschrotten of the company Aluminium Rheinfelden GmbH, March 2002, as a joint venture with the lawyer Dr. Bodo A. Baars
2001 Müllverbrennungsanlage Stapelfeld GmbH Comments on the tender specification for the disposal of residual waste -Paper for discussion on 28 August 2001- as a joint venture with the lawyer Dr. Bodo A. Baars
2001 Fachagentur Nachwachsende Rohstoffe (FNR), Gülzow,
(project funded by the Federal Ministry of Consumer Protection, Food and Agriculture - BMVEL)
Preparation of a study: "Evaluation of energetic utilization of animal carcases and parts of animal carcases at carcass disposal plants and slaughter houses" (in cooperation with wandschneider + gutjahr and the lawyer Dr. Bodo A. Baars)
2000/2001 Bundesrepublik Deutschland,
represented by the Federal Ministry for the Environment, Nature Protection and Reactor Safety in turn represented by the President of the German Ministry of the Environment
Compilation of a compendium entitled: "Technical Requirements and General Recommendations for the Disposal of Meat and Bone Meal and Tallow in Incineration Plants " (in cooperation with wandschneider + gutjahr and Dipl.-Ing. Jürgen Chibiorz)
2000 Gemeinnützige Müllkraftwerk GmbH Ludwigshafen Consultancy services for technical and legal aspects regarding approval procedure (in cooperation with the lawyer Dr. Bodo A. Baars)
2000 Müllverbrennungsanlage Stapelfeld GmbH
commissioned by a joint venture of waste incineration plant operators in North Germany
Critical examination and evaluation of the draft for the ordinance on the environmentally compatible storage of municipal waste and on biological waste treatment plants (in cooperation with the lawyer Dr. Bodo A. Baars)
1999/2000 Söderenergi AB, Södertälje (Purchaser of plant) Noell-KRC Energie- und Umwelttechnik GmbH, Würzburg (Supplier of plant) Independent expert (Chief Engineer) for the parties to the supply contract during acceptance of services rendered and the final acceptance test of a coal furnace converted to the incineration of substitute fuels (waste mono incineration) (approx.100 MW) (in cooperation with wandschneider + gutjahr)
1998/1999 Müllverbrennungsanlage Stapelfeld GmbH
commissioned by a joint venture of waste incineration plant operators in North Germany
Proposals for a common strategy to be adopted by waste incineration plant operators in North Germany (in cooperation with the lawyer Dr. Bodo A. Baars, see also Baars/Nottrodt: Eckpfeiler Müllverbrennung - Vorschläge für eine stärkere rechtliche Absicherung der Müllverbrennung in der Abfallentsorgung - Berlin: Erich-Schmidt, 1999 (cornerstones of waste incineration - proposals for a greater legal protection for waste incineration in waste disposal)
1998 Ministerium für Umwelt und Verkehr des Landes Baden-Württemberg State of technology with flue-gas cleaning plants in cement works
1998 Müllverbrennungsanlage Stapelfeld GmbH Recovery of waste in the waste incineration plant MVA Stapelfeld in consideration of the requirements specified in the Recycling and Waste Management Act
1997 Umweltministerium des Landes Nordrhein-Westfalen Preparation of a guide "Energetic Recovery" (in cooperation with Dr. U. Lahl, Oyten, and Prof. Barin, Aachen)
1997 Stadtwerke Kiel AG Recovery of waste in the waste incineration plant in Kiel in consideration of the scientific and technical requirements specified in the Recycling and Waste Management Act
1997 Abfallwirtschaftgesellschaft mbH Wuppertal Determining the capacity of the waste incineration plant in Wuppertal in cooperation with Dr. U. Lahl, Oyten, und Prof. Thomé-Kozmiensky, Berlin
1997 Stadtreinigung Hamburg Examinations for the treatment of matured timber and renewable primary products in the watse incineration plant Stellinger Moor in Hamburg
1996 Umweltbehörde der Freien und Hansestadt Hamburg, (Environmental Authorities), Special Department for Waste Management Expert report for the comparative evaluation on the thermal treatment or energetic recovery of speciel oddments (Residual waste)
1996 Stadtreinigung Hamburg Research and documentation on the history of waste incineration in Hamburg to commemorate the commissioning of the first waste incineration plant in Hamburg on 1 January 1896 (see also "100 Jahre Müllverbrennung in Hamburg", Stadtreinigung Hamburg, November 1996" (100 years of waste incineration in Hamburg"
seit 1995 bis 2001 Beratungsvertrag mit der Bremerhavener Entsorgungsgesellschaft mbH BEG Consultancy services for the management of the BEG in the course of the construction and integration of an RCP plant in the waste incineration plant Bremerhaven by VonRoll, Zürich

Preparation of instructions for the acceptance of waste in the waste incineration plant in Bremerhaven in consideration of the ordinance regarding the introduction of the European Waste Catalogue

Determining the current intrinsic value as on 31.12.1997 for the waste incineration plant in Bremerhaven

Expert opinion on the significance of industrial safety in the delivery of bone meal at the waste incineration plant in Bremerhaven - 2001
1995 Regional Administration Köln Engineering consultancy services for the regional administration in Cologne being the licensing authorities in the approval procedure for the residual waste incineration plant Cologne-Niehl
1995 Stadtreinigung Hamburg Export report entitled "Considerations on alternative processes for the thermal treatment of waste at the site of Rugenberger Damm" (see also KZ 7106 in the refuse manual, Lfg.2/97, published by the Erich-Schmidt Verlag
01.10.1994 bis zum 30.09.1996 consultancy Agreement with Goepfert, Reimer & Partner Ingenieurgesellschaft mbH Engineering services in the course of the planned replacement of the waste incineration systems and steam generators in the waste incineration plant Stellinger Moor in Hamburg and in the waste incineration plant Bremerhaven
top pfeil nach oben
platzhalter
platzhalter
platzhalter